tre.gif
Sell faster
Buy smarter
  1. All ads
  2. Commercial Equipment & Tools
  3. Stationery & Office Equipment
  4. Writing Stationery & Office Equipment
Promoted
Lagos, Isolo, 1 hour ago
8 views

0.5mm 2b Long Lead Refills

0.5mm 2b lead refill
Type
Brand New
Condition
Store address
Verified
Lagos State • Mushin
No 123 Mushin Road, isolo , Lagos
Beside General hospital isolo (2 storey building with tiles)
Closed now
• Mon - Sat, 09:00-20:00
Lagos State • Oshodi
No 123 Mushin- isolo road , beside General hospital isolo
Closed now
• Mon - Sat, 09:00-20:00
0.5mm 2B long lead refills are smooth-writing mechanical pencil leads designed for clear, dark, and consistent lines. The 2B grade gives a softer, darker mark than standard HB lead, making it suitable for writing, sketching, shading, drawing, and school or office use. Product details: Lead size: 0.5mm Lead grade: 2B Lead type: Long mechanical pencil refill Line thickness: Fine 0.5mm line Writing color: Dark graphite/black-gray Texture: Smooth and easy to write with Use: Writing, drawing, sketching, note-taking, exams, school, office, and art work Pack content: 2 refill tubes Quantity: 60 leads total, usually 30 leads per tube Material: Graphite pencil lead Design: Orange storage tubes in clear retail packaging Benefit: Long-lasting refills with clean lines and reliable performance
Show contact
Report Abuse
Safety tips
  • Avoid paying in advance, even for delivery
  • Meet with the seller at a safe public place
  • Inspect the item and ensure it's exactly what you want
  • Make sure that the packed item is the one you've inspected
  • Only pay if you're satisfied
frame_left.gif