Beside hamsat filling station Olohunsogo adesola Lagos Ibadan express way
Closed
• Mon, Sat, 05:00-19:00
Quotation for 2.5ton Ipg tank construction/ installation 1.2.5tons (2) Ipg tank sprinkler magnetic gauge feeder valve vent valve relief valve 2.Brand new 1 "black man corken pump with electric motor (years warranty)
3. Intallation kit/material return valve pressure guage lpg strainer flange to flange ball valves inch and half piping
4. Automatic dispenser,nigeria made (18month warranty ) 5.
Training of staffs on operation and sales of Ipg 6 .Delivery = 10 to 14 days 7. Maintanance and warranty on construction and installation *total *for client*. Transportation of tank
*optional but advisable* water calibration and leak test automatic shutdown valve we are registereted company and licenced to construct and install lpg tanks by the dor with certificate to proof. Visit Address: Olorunsogo, Adesola Area, Lagos Ibadan express way