tre.gif
Saida da wuri
Saye nagari
  1. Dukkanin talla
  2. Ababen Hawa
  3. Jirgin Ruwa & Kwale-kwale
  4. Injin Tona
Lagos, Lekki, 12/10
43 adadin kallo

14/12 Conventional Dredger Available

+1
Jiragen Yasa
Nau'i
2024
Shekarar da aka hada
Gwanjo
Yanayi
42m
Tsawon Jirgi
12m
Karfen Jirgi
24m
Tsawon Jirgi
15000L
Karfin shan mai
Karfe
Abin da aka hada jikin jirgi
Diesel
Nau'in mai
4000hp
Karfin na'ura
200m3/day
Karfin Fanfo
32m
Tsawon Tsani
Eh
Akwai yiwuwar Musanya
14/12 conventional dredger available a massive 14/12 conventional dredger powered by a caterpillar engine is available for serious dredging operations. option 1 — lease lease rate: ₦26,000,000 per month the dredger is available for lease to qualified operators for suitable dredging projects. option 2 — joint venture (jv) a separate jv arrangement is available for suitable dredging projects. proposed jv sharing: - dredger owner: 50% - landlord/site owner: 40% - awil: 10% lease and jv are separate arrangements and will be subject to project verification, physical inspection fees will be covered by landlord/ site owner and paid to awil and mutually agreed terms. for invoice and mou us Ask for the video abba watercraft international limited (awil) marine & dredging specialists
14/12 Conventional Dredger Available14/12 Conventional Dredger Available14/12 Conventional Dredger Available
₦ 26,000,000
Babu rangwame
1 Martanibude duka
Kai korafi
Sirrin bada kariya
  • Ka da a biya kudi kafin gama ciniki
  • A hadu da mai kaya a amintaccen wuri a fili
  • A duba abin da ake son saye domin a tabbatar shi ake bukata
  • Duba duka takardu, sai a biya kudi idan an gamsu
frame_left.gif