tre.gif
Saida da wuri
Saye nagari
  1. Dukkanin talla
  2. Kayan Aiki na Kasuwanci
  3. Kayan Rubutu da Ofis
  4. Writing Kayan Rubutu da Ofis
Wanda aka yada
Lagos, Isolo, 2 awanni da suka gabata
17 adadin kallo

0.5mm 2b Long Lead Refills

0.5mm 2b lead refill
Nau'i
Sabo Fil
Yanayi
Store address
An tabbatar
Jiha Lagos • Mushin
No 123 Mushin Road, isolo , Lagos
Beside General hospital isolo (2 storey building with tiles)
A rufe yanzu
• Lit - Asa, 09:00-20:00
Jiha Lagos • Oshodi
No 123 Mushin- isolo road , beside General hospital isolo
A rufe yanzu
• Lit - Asa, 09:00-20:00
0.5mm 2B long lead refills are smooth-writing mechanical pencil leads designed for clear, dark, and consistent lines. The 2B grade gives a softer, darker mark than standard HB lead, making it suitable for writing, sketching, shading, drawing, and school or office use. Product details: Lead size: 0.5mm Lead grade: 2B Lead type: Long mechanical pencil refill Line thickness: Fine 0.5mm line Writing color: Dark graphite/black-gray Texture: Smooth and easy to write with Use: Writing, drawing, sketching, note-taking, exams, school, office, and art work Pack content: 2 refill tubes Quantity: 60 leads total, usually 30 leads per tube Material: Graphite pencil lead Design: Orange storage tubes in clear retail packaging Benefit: Long-lasting refills with clean lines and reliable performance
Nuna lamba
Kai korafi
Sirrin bada kariya
  • Ka da a biya kudi kafin isowar kaya, ko da kudin sallawu
  • A hadu da mai kaya a amintaccen wuri a fili
  • A duba kayan, a tabbata shi ne ainihin abin da ake bukata
  • A tabbatar cewa abin da aka kunshe shi ne wanda aka duba
  • Ka da a biya sai an gamsu
frame_left.gif