tre.gif
Sell faster
Buy smarter
  1. All ads
  2. Seeking Work CVs
  3. Construction & Skilled Trade CVs
Building Construction Work

Building Construction Work

+1
3
Promoted
Lagos, Agbara-Igbesan
2036 views
Work Experience
5 years
Job Type
Contract
Employment Status
Self-Employed
Gender
Male
Marital Status
Married
Age
34
Education
Building technology
Still Studying
No
Skills
1. Excavation of the trenches for foundation or total area to depth of 2m Incase of unsuitable soil. 2. leveling and compaction of the excavated surface area with road base (rubbles), 3. Soil test to ascertain soil suitability 4. Setting out of pad footing positioning as contained in the structural drawings using profiles and lines, 5. Placement of reinforcement and neck column in the footing formwork 6. Concreting of pad footing and neck column, 7. Laying of solid block in the foundation, 8. Making of tie beam on the solid block wall, sand back filling in the whole surface area, leveling and compaction 9. Mechanically, making of solid ground floor of 10cm thickness, 10. Making of columns, beams and stair in the ground floor leading to first floor, 11. Construction of slab to structural design specification, same process is repeated for first floor to the flat roof 14. Pastering and rendering, painting, 15. Aluminum work for doors and windows,
Certifications
Bsc
Highest Qualification
Degree
Store address
Oyo State • Ibadan
Shop 121, Gbaremu Market, Sango-Eleyele Road, Ijokodo, Ibadan.
Locate the Gbaremu Market Sign Board and Call me at the sign post.
Open now
• Mon - Sat, 08:30-18:00
I can handle: 1. Excavation of the trenches for foundation or total area to depth of 2m Incase of unsuitable soil. 2. leveling and compaction of the excavated surface area with road base (rubbles), 3. Soil test to ascertain soil suitability 4. Setting out of pad footing positioning as contained in the structural drawings using profiles and lines, 5. Placement of reinforcement and neck column in the footing formwork 6. Concreting of pad footing and neck column, 7. Laying of solid block in the foundation, 8. Making of tie beam on the solid block wall, sand back filling in the whole surface area, leveling and compaction 9. Mechanically, making of solid ground floor of 10cm thickness, 10. Making of columns, beams and stair in the ground floor leading to first floor, 11. Construction of slab to structural design specification, same process is repeated for first floor to the flat roof 14. Pastering and rendering, painting, 15. Aluminum work for doors and windows,
125,000 - 150,000
37 Feedback view all
Safety tips
  • Don't disclose your personal information
  • Do your research before inviting anyone for an interview
  • Don't open links that aren't included in the candidate's CV
Mark unavailable
Report Abuse